Newtok Airport Relocation

Newtok Airport Relocation Draft Pre-PS&E Plans Available for Review (95% Design)

 

Pre-Plans, Specifications, and Engineering (Pre-PS&E):

The Pre-PS&E documents are now available for review, and represent the 95% level of design.  Please click on the links below to view the draft PS&E Plans.

Newtok Airport Relocation_Airfield Plans DRAFT

For the full Plan set and appendices, please see the Documents Page.